Create Apache Airflow DAGs for construction data pipelines. Orchestrate ETL, validation, and reporting workflows.
Extract quantities from BIM/CAD data for cost estimation. Group by type, level, zone. Generate QTO reports.
Convert IFC files (2x3, 4x1, 4x3) to Excel databases using IfcExporter CLI. Extract BIM data, properties, and geometry without proprietary software.
Push Excel data back to BIM models. Update parameters, properties, and attributes from structured spreadsheets.
Convert RVT/RFA files to Excel databases. Extract BIM element data, properties, and quantities.
Build automated ETL (Extract-Transform-Load) pipelines for construction data. Process PDFs, Excel, BIM exports. Generate reports, dashboards, and integrate with other systems. Orchestrate with Airflow or n8n.
Automated safety compliance verification for construction sites. Check PPE usage, zone access, working at heights regulations, and generate compliance reports using rule-based and ML approaches.
Aggregate and analyze risks across construction project portfolio. Identify correlated risks, systemic exposures, and portfolio-level risk mitigation strategies.
Access and utilize open construction pricing databases. Match BIM elements to standardized work items, calculate costs using public unit price databases with 55,000+ work items.
Automate construction permit tracking and management. Monitor application status, track renewal deadlines, manage document requirements, and integrate with municipal systems.
Generate Quantity Take-Off (QTO) reports from BIM/CAD data. Extract volumes, areas, counts by category. Group elements, apply calculation rules, and create cost estimates automatically.
Merge pandas DataFrames from multiple construction sources. Handle different schemas, keys, and data quality issues.
Automatically classify and extract information from construction documents using NLP. Categorize RFIs, submittals, change orders, specifications, and contracts.
Fetch construction material prices from open APIs. Track price trends, regional variations, and update cost databases.
Optimize construction site logistics including material delivery scheduling, crane positioning, storage area allocation, and traffic flow using operations research and simulation.
Extract data from construction images using AI Vision. Analyze site photos, scanned documents, drawings.
Analyze labor productivity from site data. Compare planned vs actual, identify trends, benchmark against industry standards.
Apply price escalation to CWICR estimates over time. Calculate inflation adjustments, material price indices, and labor rate increases.
Complete RFI (Request for Information) management system. Create, track, route, and analyze RFIs with automatic notifications and response deadline tracking.
Extract quantities from IFC/Revit models for quantity takeoff. Uses DDC converters to get element counts, areas, volumes, lengths with grouping and reporting.